Strangford Lough Crossing: The 60-Year Climate Case
Why climate belongs in this debate
Climate is no longer a side issue for infrastructure decisions in Northern Ireland. It is a legal duty, a test every business case must pass and, on the Ards Peninsula, a lived reality.
The law. The Climate Change Act (Northern Ireland) 2022 sets a target of net zero emissions by 2050, with at least a 48% cut by 2030 (DAERA). It requires the Department for Infrastructure to publish a sectoral plan for transport.
Transport’s share. In 2024 Northern Ireland emitted an estimated 18.4 million tonnes of CO₂e. Domestic transport was the second largest source at 21.3%, behind agriculture (DAERA, Northern Ireland greenhouse gas statistics 1990-2024).
The appraisal rules. The Department of Finance’s Incorporating Environmental and Climate Considerations into Business Cases (September 2025) asks for environmental and climate impacts to be weighed in every business case. Any decision on how people cross Strangford Lough, bridge or ferry, has to count carbon.
The road beside the lough. On 3 February 2026 the Assembly held an Adjournment debate on storm impacts on the A20 Portaferry Road (Official Report, Northern Ireland Assembly). Kellie Armstrong MLA said a school bus on the A20 was engulfed by waves during Storm Bram. The Minister for Infrastructure, Ms Kimmins, said reactive repairs to coastal defences had cost about £173,700 over five years, and that Storm Bram caused about £650,000 of damage to coastal defences in the County Down area. Michelle McIlveen MLA described such storms as “symptomatic of a shifting climate reality”.
A fixed crossing would give the southern peninsula a second route out when the A20 is closed. Whether that adds real resilience is a question a feasibility study should answer.
This post asks a narrower question: over 60 years, which option puts less carbon into the atmosphere, a bridge or the ferry?

Executive summary
In our central case, a bridge across the Narrows would make up for the carbon used to build it within five years, and would save about 50,000 tonnes of CO₂e over 60 years compared with keeping the ferry.
- Today: the ferry burns roughly 1,000 to 1,270 tCO₂e of diesel a year. Driving round the lough adds more; at our assumed 1,820 diverted trips a day, about 7,900 tCO₂e a year with today’s cars.
- Building a bridge: about 25,000 tCO₂e in our central case, in line with the Rose Fitzgerald Kennedy Bridge per metre. We also test a harsh 50,000 tCO₂e.
- Fair to the ferry: if there is no bridge, we assume two new electric ferries, not the existing diesel vessels.
- Central case: the bridge pays back its carbon in Year 5, or Year 14 if every car is electric from opening.
- Best case: Year 3 and about 111,000 tonnes saved, if traffic matches the campaign model.
- Worst case: the bridge never pays back and adds about 11,000 tonnes. That needs every car electric from opening and a bridge with three times Rose Fitzgerald Kennedy’s carbon per metre.
- The biggest unknown: how many journeys would switch to a bridge. No origin-and-destination survey exists.
- The ask: an independent TAG-compliant feasibility study, including a PAS 2080 whole-life carbon assessment, to test these figures.
This is campaign arithmetic, not a verified study. Every figure is traceable to a named source or labelled as our assumption.
Why the carbon question matters
We publish this analysis to show why the carbon question deserves a proper answer, and why only an independent TAG-compliant feasibility study can give one.
Today drivers face a choice: queue for an eight-minute crossing, or drive about 75 km round the lough (Strangford Lough Ferry Service Strategic Review Report, Department for Regional Development, 22 March 2013, released under DOF-2024-0440, Annex C). Both choices burn fuel, every day, for as long as nothing changes.
The carbon cost of building a bridge
Building a bridge would release roughly 25,000 to 50,000 tonnes of CO₂e, almost all of it before the first car crosses.
No Strangford figure exists, so we borrowed the nearest benchmark. The Corran Fixed Link: Updated Costs, Final Report (Stantec, for HITRANS) puts a high-level bridge at about 3,200 kgCO₂e per square metre of deck, or 22,400 tCO₂e at Corran, excluding approaches.
Applied to the 650 m span in the Department for Infrastructure memorandum DFI-2024-0412 (22 August 2024), with an assumed 12 m deck, that gives about 25,000 tCO₂e. Our pessimistic case doubles it to 50,000 tCO₂e for approach roads and ancillary works. We add a maintenance allowance of 20% spread over 60 years. The deck width, the doubling and the maintenance allowance are our assumptions.
How that compares with two Irish bridges
Neither bridge has a published carbon figure, so we worked from their published material quantities. The Rose Fitzgerald Kennedy Bridge over the River Barrow is 887 m long and used 70,000 tonnes of concrete and 7,000 tonnes of reinforcing steel (BAM Ireland). Applying the factors in a US National Cooperative Highway Research Program bridge example (0.159 tCO₂e per tonne of concrete, 1.71 per tonne of steel), that is about 23,000 tCO₂e (NCHRP).
Narrow Water Bridge, now under construction by the same contractor, is 195 m long (ROD). Only its main steel has been reported so far: two deck sections and a pylon totalling about 2,280 tonnes (The Construction Index). That alone is at least 3,900 tCO₂e, before any concrete, piling or the opening span.
| Bridge | Length | Estimated tCO₂e | tCO₂e per metre |
|---|---|---|---|
| Rose Fitzgerald Kennedy | 887 m | about 23,000 (concrete and steel only) | about 26 |
| Narrow Water | 195 m | at least 3,900 (main steel only) | at least 20 |
| Strangford, our central case | 650 m | 25,000 | about 38 |
| Strangford, our pessimistic case | 650 m | 50,000 | about 77 |
At Rose Fitzgerald Kennedy’s rate, a 650 m Strangford bridge would need about 17,000 tCO₂e of materials, or 20,000 to 25,000 tCO₂e once cables, transport and construction are added. Our central case sits at the top of that range. Our pessimistic case would carry twice Rose Fitzgerald Kennedy’s carbon on three-quarters of its length, so we treat it as a deliberately harsh test.
What the ferry costs the climate
On diesel, the ferry emits roughly 1,000 to 1,270 tCO₂e a year. The 2013 Strategic Review records a fuel spend of £206,000 in 2011/12. At an assumed 55p to 70p a litre, that is about 294,000 to 375,000 litres. We applied the UK Government’s Greenhouse gas reporting: conversion factors 2025 (Department for Energy Security and Net Zero, June 2025) for marine gas oil: about 2.78 kgCO₂e per litre burned, plus about 0.63 kgCO₂e per litre to produce and supply it.
A ferry is also a ship that has to be replaced. MV Portaferry II entered service on 18 December 2001 (Wikipedia, MV Portaferry II), and MV Strangford II on 2 February 2017 (DFI-2024-0412). Over 60 years we allow for two new electric vessels, in Years 3 and 13. Each carries about 1,833 tCO₂e from manufacture. That is the figure OSK-ShipTech found in its life-cycle assessment of Grotte, a 50 m fully electric double-ended ferry in Denmark (Marine Log).
Electrification cuts ferry emissions sharply. Over 60 years the ferry’s total, including both new vessels, falls from about 65,000 tCO₂e on diesel to about 14,000 tCO₂e. So we have not assumed a dirty ferry to flatter the bridge.
The long way round
The biggest climate gain comes from the miles not driven. We assume 1,820 trips a day would switch from the road round the lough to the bridge, each saving about 67 km. That is 25% of the 7,280 vehicles a day counted on the A20 Portaferry Road at Kircubbin (DfI count point 444, Northern Ireland Traffic Count Data 2023).
We hold that figure flat for 60 years, ignoring any growth. It equals about 44.5 million vehicle-kilometres, or about 7,900 tCO₂e a year with today’s cars. The campaign’s own traffic model implies about 2,800 trips a day, 38% of the Kircubbin count, which we treat only as an upper case.
The 2025 conversion factors put the average UK car at about 0.177 kgCO₂e per km (Energy Saving Trust). An average electric car is about 0.05 kgCO₂e per km today. We assume this falls to 0.01 by 2050 as the grid gets cleaner.
As the car fleet goes electric, each kilometre saved is worth less carbon. We therefore model two futures: cars all-electric by 2050, and every car electric from opening day. We assume the bridge opens in 2035, based on the six to seven years from decision to opening estimated for Corran.
The 60-year result
In our central case the ferry’s running total overtakes the bridge in Year 5, or Year 14 if every car is electric from opening. After that, every year widens the gap.

Campaign model, November 2026. Central case: bridge 25,000 tCO₂e to build, two new electric ferries, opening 2035.
By Year 60 the ferry has emitted about 1.6 to 2.7 times as much as the bridge. The table tests the result against a dearer bridge, and against the campaign’s higher traffic estimate.
| Case | Ferry overtakes bridge | Net saving by Year 60 (tCO₂e) |
|---|---|---|
| Cars all-EV by 2050, bridge 25,000 t | Year 5 | 50,000 |
| Cars all-EV by 2050, bridge 50,000 t | Year 12 | 20,000 |
| All cars EV from opening, bridge 25,000 t | Year 14 | 19,000 |
| All cars EV from opening, bridge 50,000 t | Never | 11,000 worse off |
| Upper case: campaign traffic model (38% of Kircubbin), cars all-EV by 2050, bridge 25,000 t | Year 3 | 111,000 |
The result reverses only when every car is electric from day one and the bridge carries three times Rose Fitzgerald Kennedy’s carbon per metre. That is exactly why the real figures matter.
Best, central and worst: what would have to happen
The answer depends on three things nobody can know for certain yet: how many people would use the bridge instead of driving round, how quickly cars go electric, and how much carbon goes into building the bridge. Here is what each outcome would need.
| Best case | Central case | Worst case | |
|---|---|---|---|
| Trips switching from the road round the lough | About 2,800 a day, the campaign model’s figure | About 1,820 a day, a quarter of today’s Kircubbin traffic | About 1,820 a day |
| Cars | Most still petrol or diesel for years; all electric by 2050 | All electric by 2050 | Every car electric the day the bridge opens |
| Building the bridge | 25,000 tCO₂e, in line with Rose Fitzgerald Kennedy | 25,000 tCO₂e | 50,000 tCO₂e, three times Rose Fitzgerald Kennedy per metre |
| The ferry if no bridge | Two new electric ferries | Two new electric ferries | Two new electric ferries |
| When the bridge pays back its carbon | Year 3 | Year 5 | Never |
| Net carbon after 60 years | About 111,000 tonnes saved | About 50,000 tonnes saved | About 11,000 tonnes extra |
For the best case, the bridge would need to draw heavy use from day one, while most cars on Northern Ireland’s roads still burn fuel.
For the central case, a quarter of the traffic already passing Kircubbin would need to switch to the bridge, with the car fleet becoming fully electric by 2050, which is our assumption, not a Government forecast.
For the worst case, every car would need to be electric by the 2030s, and the bridge would need to be built with far more carbon than recent Irish bridges of a similar type. Both are unlikely, and they would need to happen together.
A point to reflect on: in our model, the sooner a bridge is built, the more petrol and diesel journeys it replaces, and the better its carbon case. Every year of delay weakens it.
What we have assumed, and what is verified
We hold ourselves to the same evidential standard we ask of Government.
| Input | Status |
|---|---|
| Ferry fuel spend of £206,000 in 2011/12 | Sourced: 2013 Strategic Review (DOF-2024-0440, Annex C). Out of date; current figures should be released by DfI |
| Diesel price of 55p to 70p a litre | Our assumption |
| Emission factors for cars and marine fuel | Sourced: DESNZ conversion factors 2025 |
| Embodied carbon of the bridge | Benchmarked from the HITRANS Corran study and checked against Rose Fitzgerald Kennedy and Narrow Water material quantities; deck width and carbon factors assumed |
| Embodied carbon of an electric ferry | Sourced: OSK-ShipTech’s Grotte assessment, a larger vessel than Strangford’s |
| Vehicle-kilometres saved | Our assumption: 25% of the 2023 Kircubbin count. Needs an origin-and-destination survey |
| Grid decarbonisation, opening in 2035, ferry replacement years | Our assumptions |
We have not counted the following, all of which favour the bridge: vehicles idling in ferry queues, a likely third replacement ferry before Year 60, and ferry charging infrastructure. We have not netted off emissions from new trips that only happen because a bridge exists, which favours the ferry.
The ask
The climate case cannot be settled by campaign arithmetic, and it cannot be settled by refusing to look.
The Department of Finance’s Incorporating Environmental and Climate Considerations into Business Cases (September 2025) points appraisers to PAS 2080 for infrastructure whole-life carbon. An independent TAG-compliant feasibility study is the instrument that would produce that assessment, and test the figures above.
We ask the Minister for Infrastructure to commission one, with no presumption of construction. Read more and add your voice at strangfordloughcrossing.org.
Sources
- Strangford Lough Ferry Service Strategic Review Report, Department for Regional Development, 22 March 2013 (DOF-2024-0440, Annex C)
- Department for Infrastructure memorandum, 22 August 2024 (DFI-2024-0412)
- Corran Fixed Link: Updated Costs, Final Report, Stantec for HITRANS
- Greenhouse gas reporting: conversion factors 2025, DESNZ, June 2025
- Energy Saving Trust, Fleet Decarbonisation Toolkit, emission factors
- Is there no such thing as a zero-emission vessel?, Marine Log, on OSK-ShipTech’s Grotte life-cycle assessment
- Rose Fitzgerald Kennedy Bridge, BAM Ireland
- NCHRP Web Resource 1, Appendix C: Bridge Replacement Example, Transportation Research Board
- Narrow Water Bridge, ROD
- Belgian bridge crosses sea to Northern Ireland, The Construction Index
- The Climate Change Act (Northern Ireland) 2022: Key elements, DAERA
- Northern Ireland greenhouse gas statistics 1990-2024 released, DAERA
- Official Report (Hansard), Northern Ireland Assembly, Tuesday 3 February 2026, Adjournment: Storm Impact: A20 Portaferry Road (Vol. 188, No. 2)
- MV Portaferry II, Wikipedia